Bouygues Construction
Platform and steel structure in the control zone.
Acietec collaborated in the development of a steel structure platform for the test area that was used to facilitate the operations of the Alto Tower construction site, given its complexity.
ACIETEC – Building your present, to grow with you in the future.
- Studies
- Manufacturing
- Assembly
- Consulting